Skip to product information
1 of 6

Kalomo

Kalomo Stainless Steel Grill Grates Grill Replacement Parts for BBQ Backyard Grill BY14-101-001-099 GBC1440WRSB-C GBC1449WBS-C GBC1449WRS-C, Uniflame GBC1030WRS-C GBC1134WRS Cooking Grids Accessories

Kalomo Stainless Steel Grill Grates Grill Replacement Parts for BBQ Backyard Grill BY14-101-001-099 GBC1440WRSB-C GBC1449WBS-C GBC1449WRS-C, Uniflame GBC1030WRS-C GBC1134WRS Cooking Grids Accessories

Regular price $73.50 USD
Regular price Sale price $73.50 USD
Sale Sold out
Shipping calculated at checkout.

About this item

  • [Reference BRAND and MODEL] Fits Backyard Grill Models: BY14-101-001-099 GBC1440WRSB-C GBC1449-C GBC1449W-C GBC1449WBS-C GBC1449WRS-C. Fits Uniflame Grill Models: GBC1030W GBC1030WRS GBC1030WRS-C GBC1134W GBC1134WRS GBC1343WP-U.
  • [Solid Stainless Steel] All of our grill grates are made of 7MM solid and sturdy stainless steel, strong, durable and long lasting,16 3/8" x 9 1/2"for each grate, 16 3/8" x 28 1/2"for 3pcs total
  • [Perfect Stainless Grill Grates] These cooking grates gas grill parts are made of durable stainless steel with strong oxidation resistance, corrosion resistance and heat resistance. The durability makes them unnecessary to be changed again and again, ideal grill parts for Weber.
  • [Multifunctional BBQ Parts] Add a smoky flavor to your food and heat your food evenly to get delicious barbecue flavor in your backyard or outdoor gourmet gathering.
  • [Note] Our BRAND and MODEL are Reference ONLY! Make sure you measure the size of your original parts and compare with the grill repair kits BEFORE you order
View full details
  • ⭐️⭐️⭐️⭐️⭐️

    I’m slowly transitioning to a zero-waste lifestyle, and this shop has made it so much easier. The bamboo utensils are a game-changer.
    Sophia M.

  • ⭐️⭐️⭐️⭐️⭐️

    I finally found a tote bag that’s both stylish and sustainable. It’s practical and looks great, so I bring it with me everywhere.
    Liam R.

  • ⭐️⭐️⭐️⭐️⭐️

    Absolutely love how eco-conscious this brand is. The reusable wraps are not only cute but also super effective!
    Ava K.

FAQ

How long does shipping take?

Shipping takes place within 3-5 business days. If there is a problem with the shipment of the product, we will notify you via the email address you entered when ordering.

Is free shipping available?

We do not currently offer free shipping. However, this may be added at some point. We apologize.

How can I get a tracking number for my order?

If your order has been shipped, we will add the tracking number to your order and notify you via the email address you entered when ordering.

How do I process a return or exchange?

For returns or exchanges, please contact us within 14 days of receiving the product, along with a receipt or screenshot of the purchase, and a photo of the product with the packaging or tag intact.